Solar System with Flexible panels in Escape 19 - Escape Trailer Owners Community
Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×

Go Back   Escape Trailer Owners Community > Escape Tech > Modifications and Alterations
Click Here to Login
Reply
 
Thread Tools Display Modes
 
Old 06-02-2020, 05:31 PM   #1
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Solar System with Flexible panels in Escape 19

I completed my solar installation on my 2019 Escape 19 a couple weeks ago and had a chance to put it to use on a 6 day camping trip last week. I thought I would give an overview of my installation as some payback for all the good information I got from the forum. I also had great input from Jim Bennett, as well from my electronics wizard buddy who also helped me with the installation. Please note that this is the way I did it and not the only way, so if you prefer other installation equipment and methods better, go for it.

I chose to do my own solar installation specifically because I wanted to go with flush panels as:
• I am an aviation guy and I like the low profile aerodynamics of a flat panel over one stuck up in the wind,
• I like the fact that the panels are out of sight from the ground, which to me is more aesthetically pleasing, and
• the panels are less visible for theft and a lot more difficult to steal than ridged panels.

I ordered my trailer pre wired for solar, which greatly simplified the installation providing the MC4 connector on the roof and the wires running down to the driver’s side under seat area and from there to the battery. Note that I do not have an inverter.

The main components I used were purchased from Lensun.
1. 80W 12V Black Flexible Solar Panel. 37” x 21” Lensun panels. I chose this panel supplier as they had been already researched by Jim Bennett and used by many other forum members. These panels are the perfect size for the trailer as the 37” length just fits the raised center roof width without going over the edge radius. I was able to install 3 panels for a total of 240 Watts. Note that I chose the standard panels without the edge protection as I feel the existing edge will take the wind load and minor dirt and bug impacts. I did not want the additional thickness of the edge channel where I was going to bond.
2. 30A MPPT Solar Panel Regulator Charge Controller and LCD Display Remote Meter (MT-50) 12/24V. The website shows this controller as a Lensun product but it is actually an EPSOLAR unit. Many suppliers identify EPSOLAR components as their own. In fact, I found Renogy had better manuals on line for the monitor than what came with the component. I could have used a 20A controller but the 30A is only $10 more and will allow me to add external panels at a later date if I so choose. I ordered it with a remote monitor, which allows monitoring of the system without going under the dinette bench and is easier to use to program the controller with than the controls on the controller itself. It also makes it easier to enter the specific charge parameters for my batteries (factory 2 x 6 volt flooded) instead of the pre-set values. I did enter my own user values.
3. I also ordered the MC4 connectors from Lensun as it was easy and the cost was competitive. I did order breakers and a DIN mount, additional panel wire for the roof, and adhesive tape from other sources. I borrowed the MC4 crimping tool from Jim Bennett and my buddy 3D printed me some MC4 wrenches.

Panel Installation on Roof.

I installed one panel at the front, one in the middle, and one at the rear of the trailer (see photos).
Click image for larger version

Name:	P1040353.jpg
Views:	209
Size:	79.8 KB
ID:	47398
Note that the highest structural loads on the panel do not come from wind on the leading edge, but from any lift from the airflow (Bernoulli's principle for you aviation/fluid dynamics guys). I considered using Eternabond or 3M VHB tape and feel that both are good options. Both have the strength and will seal the edges from water ingress. The Eternabond tape is likely safer if you are at all concerned about bonding preparations as I feel it is more forgiving if there are preparation issues. I decided to go with the VHB tape as I liked the look better (not that you can really see it from the ground) and have high confidence in its bonding capabilities from my experience using it in aviation design work. It is also used for bonding panels on cargo trailers, panel trucks and skyscrapers so I was not concerned about using it on these panels. I also believe it is easier to remove than Eternabond if you ever need to replace a panel and 3M provides instruction and sells the tools for removal. It does require careful surface preparation to prevent bond failure.
I chose 3M VHB Heavy Duty Mounting Tape 5952 Black, 3/4 in wide x .045” thick. This tape is good for high to medium energy surfaces (high being very glossy smooth). It also has good thickness to account for variations between the two surfaces. It is weatherproof. I chose ¾” width even though my calculations showed ½ was adequate, just for an additional margin of safety.
Panel Preparation:
• Clean the panel bond areas with IPA (Isopropyl Alcohol, not India Pale Ale).
• I ran tape around the entire perimeter which is overkill for strength but I wanted to seal out any moisture. I also put it over the redundant grommet holes at the corners, and sealed the grommets with calking to prevent water ingress.
• I also put three 6” strips equally spaced under the panel, longitudinally to the trailer. This was to prevent the panel from sagging inside the perimeter tape and prevent any chaffing (however unlikely) between the panel and the roof.
For the roof I did the following:
• washed the roof with soap and water and rinsed with clean water
• cleaned the area with IPA
• masked the perimeter of the panel profile with painters tape
• lightly scuffed the area next to the tape where the VHB will bond with maroon 3M Scotch-Brite to improve the bonding surface
• cleaned the area again with IPA
• peeled off all the surface film on the center strips and pealed a small length of the surface film on the perimeter tape and placed the panels in position. I did this rather than pealing it all off at once to give some forgiveness if I accidentally set the panel in the wrong position.
• pulled off the remaining film and pressed the panels in place
• using a hand roller pressed all tape contact areas down firmly
• removex the painters tape
3M data states: “After application, the bond strength will increase as the adhesive flows onto the surface. At room temperature, approximately 50% of the ultimate strength will be achieved after 20 minutes, 90% after 24 hours and 100% after 72 hours. Handling Strength is typically achieved immediately after application of pressure to the bonded components. In some cases, bond strength can be increased and ultimate bond strength can be achieved more quickly by exposure of the bond to elevated temperatures (e.g. 150°F (66°C) for 1 hour)”. 3M also has a graph that shows curing over several days at 10°C (50°F).
Being in Calgary in May I was concerned about bonding temperatures. The forecast for the day was for a high of 19°C (66°F) and lows of 3°C (37°F). I was a bit worried but in the end it was a very sunny day and the surface area of the black panels was measured to be around 125°F and the panels were at these temperatures for at least 4 hours.
I secured the cables with black tie wraps (zip ties) and the wrap mounts were also secured with VHB tape.
I did a 270 km (168 mi) trip this weekend with speeds up to 120 kph (75 mph) and we have had lots of rain since the installation and nothing has lifted or moved.
Controller and Monitor Installation:
Click image for larger version

Name:	P1040338.jpg
Views:	142
Size:	164.9 KB
ID:	47399
I installed the controller on top of the black water tank under the driver’s side dinette seat where the pre wired cable ends installed at the factory terminated (see photo). I used circuit breakers on the positive wire entering the controller and exiting the controller to the battery, the same way Jim Bennett did. This was not only to provide circuit protection but also as shut off switches to isolate the controller, if required. I had to make a small mounting plate to fit the breakers in front of the controller and mounted them on a DIN strip.
I installed the monitor in the overhead bin bulkhead forward of the main door where it is easy to check by just poking your head in the door (see photos). To connect it there, I had to get a CAT4 cable longer than the one provided. You can use a cable up to 50 meters long. I had to drill a 2.5 inch hole to flush mount the monitor unit.
Click image for larger version

Name:	P1040340.jpg
Views:	124
Size:	141.4 KB
ID:	47400Click image for larger version

Name:	P1040349.jpg
Views:	99
Size:	150.8 KB
ID:	47401
Circuit layout (see wiring diagram):
My wiring seems to be typical of most solar installations that I have seen with one exception. The controller has provisions to run the trailer load. I think this is common on many MPPT controllers but I have not seen it used (in my limited experience with other solar installations). I removed the main 12 volt jumper from the battery self-reset breaker to the 12 volt disconnect switch, and connected the 12 volt source wire from the controller to it. The system is now protected by the breakers I installed for the controller. Note that my trailer, which was completed in December 2019, has this switch under the bench and not on the front of it, and the switch has a large removable key.
The advantages of this are:
• The system uses power directly from the panels to power the load and uses the battery to top it up. This means you only draw down the battery when you are not providing enough from solar.
• This allows the monitor to also display the system load draw, along with the PV voltage/amperage output, and battery voltage and amperage in/out. It also displays if the battery is charging or being discharged.
• You can turn off the 12 volt load at the monitor without going to the 12 volt shut off switch under the dinette bench.
Click image for larger version

Name:	rv-solar.png
Views:	130
Size:	41.9 KB
ID:	47402
In conclusion, I am very happy with the installation. When camping last week we had one night that left surface ice in the dog’s water dish, so the furnace ran a fair bit (not a scientific measurement). The next day was a bit cloudy and the batteries were fully charged by mid-morning. I am very happy with the ease of monitoring the solar, battery, and trailer load. It will meet our current and foreseeable power requirements.
Mark B1 is offline   Reply With Quote
Old 06-02-2020, 05:57 PM   #2
Senior Member
 
Join Date: Sep 2015
Location: Ravena, New York
Trailer: Getting a 21NE early next year
Posts: 291
Nice work!
frank_a is offline   Reply With Quote
Old 06-02-2020, 06:15 PM   #3
Member
 
Join Date: Jul 2019
Location: PNW, British Columbia
Trailer: 2013 - 19
Posts: 87
That looks so professional! You and Jim could go into business. I have a very similar set up that i finished yesterday. Differences. 1) I used eternabond - maybe the stickiest tape ever 2) I installed 2 panels (fore and aft) on the roof and will use the 3rd as a portable. 3) my MT 50 remote meter is installed above kitchen sink. 4) I installed the Renogy cable entry plate at the front of the trailer directly above the dinette cab.
Pembyescape is offline   Reply With Quote
Old 06-02-2020, 06:44 PM   #4
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by frank_a View Post
Nice work!
Thanks
Mark B1 is offline   Reply With Quote
Old 06-02-2020, 06:51 PM   #5
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by Pembyescape View Post
That looks so professional! You and Jim could go into business. I have a very similar set up that i finished yesterday. Differences. 1) I used eternabond - maybe the stickiest tape ever 2) I installed 2 panels (fore and aft) on the roof and will use the 3rd as a portable. 3) my MT 50 remote meter is installed above kitchen sink. 4) I installed the Renogy cable entry plate at the front of the trailer directly above the dinette cab.
Thanks, though a busness would mean working again. I thought about putting the MT 50 over the sink as it does match nice with the factory display at the other end of the cabinet. Cable entry at the front of the trailer would have been nice as you end up with shorter cable run internally. I ended up running external cable from the front to the back on the roof, only to have the factory cable run forward again. It is not a great distance so I am sure there is not much line loss, especially with the current/voltage readings I am getting.
Mark B1 is offline   Reply With Quote
Old 06-02-2020, 08:19 PM   #6
Senior Member
 
cpaharley2008's Avatar
 
Join Date: Jun 2010
Location: Central, Pennsylvania
Trailer: Escape#5 2022 E19
Posts: 26,268
Do you have a single 12v battery in the box or dual 6 volts?
__________________
Jim
Sometime life gets in the way of living.......
cpaharley2008 is offline   Reply With Quote
Old 06-02-2020, 08:33 PM   #7
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by cpaharley2008 View Post
Do you have a single 12v battery in the box or dual 6 volts?
I have the factory installed dual 6 volt flooded batteries.
Mark B1 is offline   Reply With Quote
Old 06-02-2020, 09:24 PM   #8
Senior Member
 
Jim Bennett's Avatar
 
Join Date: Oct 2008
Location: Calgary, Alberta
Trailer: 2017 Escape 5.0 TA
Posts: 15,532
Great job! Love the overhead shot, looks nice and tidy.
__________________
2017 Escape 5.0 TA
2015 Ford F150 Lariat 3.5L EcoBoost
2009 Escape 19 (previous)
“Most folks are about as happy as they make up their minds to be.” — Abraham Lincoln
Jim Bennett is offline   Reply With Quote
Old 06-02-2020, 09:28 PM   #9
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by Jim Bennett View Post
Great job! Love the overhead shot, looks nice and tidy.
I had good input on the installation.
Mark B1 is offline   Reply With Quote
Old 06-06-2020, 04:07 PM   #10
Senior Member
 
Join Date: Apr 2018
Location: Fort Collins, Colorado
Trailer: 2017 Escape 19
Posts: 253
Thanks for the detail,Mark! Helps considerably.
ColoradoSwany is offline   Reply With Quote
Old 06-06-2020, 06:10 PM   #11
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by ColoradoSwany View Post
Thanks for the detail,Mark! Helps considerably.
Glad to be of help. Feel free to ask if you want any more details.
Mark B1 is offline   Reply With Quote
Old 06-09-2020, 12:20 PM   #12
Senior Member
 
Join Date: Jul 2019
Location: St Louis, Missouri
Trailer: 2021 21NE F2
Posts: 235
Mark, Nice work and explanation! Did you total up the costs for the install? Thanks
mfschu is offline   Reply With Quote
Old 06-09-2020, 01:09 PM   #13
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by mfschu View Post
Mark, Nice work and explanation! Did you total up the costs for the install? Thanks
Thanks. My order with Lensun was $686.99 USD and I would estimate I spent another $100 on Adhesive, wire, tie wraps, and breakers etc. Not having to buy any tools was a help and I always have things like things like tape and IPA in my garage. I also paid for the factory solar wiring installation.

It makes my cost a little less than the double panel installation from the factory. I believe the double panel from the factory has higher wattage, however I do not need that much power and I like the installation I did for reasons covered in my post.
Mark B1 is offline   Reply With Quote
Old 06-09-2020, 03:00 PM   #14
Senior Member
 
Join Date: Jul 2019
Location: St Louis, Missouri
Trailer: 2021 21NE F2
Posts: 235
Thanks Mark for the additional information! Very nice installation!
mfschu is offline   Reply With Quote
Old 06-09-2020, 03:52 PM   #15
Senior Member
 
sherminator's Avatar
 
Join Date: Aug 2012
Location: Tigard, Oregon
Trailer: 2020 21NE - dual dinettes
Posts: 398
Nice job. I intend to do the same thing when I get my 21NE in September. You have laid out a pretty nice example to follow, and I see no reason to deviate from it in any way. I have some experience with VHB tape, and I agree that it is an effective way to bond. I know the rigid panels are more efficient, especially over time, but I don't like seeing those big panels up there creating drag and collecting mold & debris underneath.
sherminator is offline   Reply With Quote
Old 06-09-2020, 11:16 PM   #16
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by sherminator View Post
Nice job. I intend to do the same thing when I get my 21NE in September. You have laid out a pretty nice example to follow, and I see no reason to deviate from it in any way. I have some experience with VHB tape, and I agree that it is an effective way to bond. I know the rigid panels are more efficient, especially over time, but I don't like seeing those big panels up there creating drag and collecting mold & debris underneath.
Glad you found this helpfull.
You know I used to work with a guy named Sherman who also was called the Sherminator.
Mark B1 is offline   Reply With Quote
Old 06-10-2020, 08:02 AM   #17
Senior Member
 
Jim Bennett's Avatar
 
Join Date: Oct 2008
Location: Calgary, Alberta
Trailer: 2017 Escape 5.0 TA
Posts: 15,532
Quote:
Originally Posted by Mark B1 View Post
It makes my cost a little less than the double panel installation from the factory. I believe the double panel from the factory has higher wattage, however I do not need that much power and I like the installation I did for reasons covered in my post.
Unless they have changed it, the solar controller Escape uses is/was PWM and not MPPT, which is a bit cheaper too.
__________________
2017 Escape 5.0 TA
2015 Ford F150 Lariat 3.5L EcoBoost
2009 Escape 19 (previous)
“Most folks are about as happy as they make up their minds to be.” — Abraham Lincoln
Jim Bennett is offline   Reply With Quote
Old 06-10-2020, 08:39 AM   #18
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by Jim Bennett View Post
Unless they have changed it, the solar controller Escape uses is/was PWM and not MPPT, which is a bit cheaper too.
Good point. I forgot to mention that wanting to get the advanced features of the MPPT controller was a strong part of my decision to do my own installation over ordering th factory installation.
Mark B1 is offline   Reply With Quote
Old 06-17-2020, 10:25 AM   #19
Senior Member
 
gklott's Avatar
 
Join Date: Jan 2019
Location: Johnson City, Texas
Trailer: 2019 19 ft.
Posts: 484
Nice work.
__________________
Mary & Gus
K5MCL & KR4K
2019 E19' (F1), Mercedes Sprinter 2500 or GLS580
gklott is offline   Reply With Quote
Old 06-17-2020, 10:28 AM   #20
Senior Member
 
Join Date: Sep 2019
Location: Calgary, Alberta
Trailer: 2019 Escape 19
Posts: 176
Quote:
Originally Posted by gklott View Post
Nice work.
Thanks.
Mark B1 is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off




» Featured Campgrounds

Reviews provided by

Disclaimer:

This website is not affiliated with or endorsed by Escape Trailer Industries or any of its affiliates. This is an independent, unofficial site.


All times are GMT -5. The time now is 08:27 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Copyright 2023 Social Knowledge, LLC All Rights Reserved.