Hello all.
We have been members of the Escape Forum for several years and this is a first post.
I have been reading what seems like a thousand post from other members, I would first like to thank you all for the tremendous efforts made by so many to share your knowledge and experience on so many subjects. After being a recipient of your worthwhile information for over two years I hope that I will be of some use as a contributor when we pick up our new 2023 E19 F1 from Escape via Sumas, and gain some experience.
We put our deposit down over two years in 2021 with a build date of summer 2023. Since our deposit and going through the build sheet process, and during the build sheet process a few configuration changes were made by Escape at the very last minute.
1) the standard refrigerator is now a two door 7 cu ft model and the microwave cabinet above the refrigerator has been eliminated ( I didn’t want that but maybe it will work out real good after all . 2) the emergency escape window will no longer be able to open for ventilation (not happy about that one). No other changes that I can recall !
We plan on going to the factory the day before delivery to Sumas, and do a pre-delivery inspection. Does someone have a check list for inspection at the factory prior to receiving the unit as acceptable and hopefully I won’t need a punch list for things that need fixing.
Thanks so much for all your help.
Bill
We have been members of the Escape Forum for several years and this is a first post.
I have been reading what seems like a thousand post from other members, I would first like to thank you all for the tremendous efforts made by so many to share your knowledge and experience on so many subjects. After being a recipient of your worthwhile information for over two years I hope that I will be of some use as a contributor when we pick up our new 2023 E19 F1 from Escape via Sumas, and gain some experience.
We put our deposit down over two years in 2021 with a build date of summer 2023. Since our deposit and going through the build sheet process, and during the build sheet process a few configuration changes were made by Escape at the very last minute.
1) the standard refrigerator is now a two door 7 cu ft model and the microwave cabinet above the refrigerator has been eliminated ( I didn’t want that but maybe it will work out real good after all . 2) the emergency escape window will no longer be able to open for ventilation (not happy about that one). No other changes that I can recall !
We plan on going to the factory the day before delivery to Sumas, and do a pre-delivery inspection. Does someone have a check list for inspection at the factory prior to receiving the unit as acceptable and hopefully I won’t need a punch list for things that need fixing.
Thanks so much for all your help.
Bill