Quote:
Originally Posted by padlin
You normally tie all the negative leads to one side of a shunt, then the battery connects to the other end using suitable wire to handle the complete load. The meter reads across the 2 sides of the shunt.
On edit
Look at the 3rd image on the web page you provided.
|
Is this the image you are referring to?
Load #1 would be my heater
Load #2 would be my cigarette lighter
Load #3 would be my lights
tie all the grounds to the shunt.